Makkah Haram Expansion

rLocation
Makkah, KSA
Project year
2012-2024
Project
Haram expansion
Share media

about

MAKKAH HARAM EXPANSION lead quality control consultants

Following the success of the Makkah Clock Tower project, INT global was awarded with several special packages within the Shamiya expansion project. Including being appointed as led quality control consultant for all special packages in this phase of the Makkah Haram Expansion.

01 I LED LUMINARIES

Assembly of LED Linear Luminaries in gold plated housings, laying of electrical installation, wiring control boxes and final testing & commissioning.
Total length of LED luminaries: 7,565 m, 

total length of installed cables: 100,000 m
Manpower team: 

20-60 electricians and technicians
Working on heights ranging from 6 m to 28,5 m

02 I CEREMONIAL DOME

The Ceremonial Dome is more than just an architectural highlight. The movable dome is designed to be opened when the weather is favorable, but also to automatically open in the event of an emergency to enable smoke extraction. INT global scope includes installation and commissioning of:
The LED lights,
The drive train featuring eight 30kw gear motors ·
The fire alarm system.
Configuration and connection of the system to the BMS

03 I MOVABLE SKYLIGHTS

Installation of 12 motorized movable skylights across the Haram expansion each equipped with:
8 single trolleys, paired into 4 tandem carriages, 

to offer a fail-safe redundancy

Each skylight die driven by 2 gear motors in a master and slave control configuration
All cables are pulled and connected to the skylight through stainless steel energy chains

04 I MOBILE MATAF LED LIGHT SYSTEM

Installation of the LED Light system into decorative ceiling panels. Setup of the fibre optic network to link up all the software controlled LED lights.
Total length of installed cables: 163,154 m
7,362 splicing points
1,008 5×5 LED ceiling luminaries
864 4×4 LED ceiling luminaries
94 poles on top of mataf

05 I SOUTH ELEVATION SCREENS

Installation of gold plated, electro-motorized, sensor controlled glass doors.
Central control and monitoring of all systems

INT global technicians were specially trained to install the elements by the manufacturer in Germany

06 I MECHANICAL INSTALLATIONS IN MINARETS 1 & 4

Installation of various steel constructions 

inside minarets including platforms, 

brackets and all mechanical installations

07 I NORTH BRIDGES GLAS FACADE

N SCREENS

Installation of special facade elements, 

made of steel, aluminium, and glass, with electrically controlled sliding glass components.

Total 72 arched openings on 4 bridges
Total glass surface: 12,000 square meter

08 I QUALITY CONTROL & ON-SITE ENGINEERING SERVICES

Ongoing quality control of all special packages of the Haram expansion to ensure all contractors provide a complete and properly constructed product in accordance with all standards, plans and documentation.
10 engineers & architects across electrical, mechanical, architectural and civil engineering fields

0
Meters of installed cables​
0
Electricians and technicians​
0
Engineers & architects

gallery